Skip to main content

Waste Mass

King's College London have made us aware that following a review of their 2014/15 Waste Mass returns, they have made the following recalculations:

  • Non-Residential Waste Mass Recycled (ENRWMREC) should have been 641.999 tonnes
  • Non-Residential Waste Mass Incineration (ENRWMINC) should have been 171.6 t
  • Non-Residential Waste Mass Anaerobic Digestion (ENRWMADI) should have been 45.546t
  • Non-Residential Waste Mass Landfill (ENRWMLAN) should have been 0.321t
  • Non-Residential Waste Mass Used to Create Energy (ENRWMENE) should have been 721.978t
  • Non-Residential Waste Mass Other (ENRWMOTH) should have been 85.8t
  • Residential Waste Mass Recycled (ERWMREC) should have been 72.414t
  • Residential Waste Mass Used to Create Energy (ERWMENE) should have been 174.151t
  • Other Works Waste Mass Recycled (EOWMREC) should have been 20.470t
  • Other Works Waste Mass Landfill (EOWMLAN) should have been 0.000t
  • Other Works Waste Mass Used to Create Energy (EOWMENE) should have been 0.65t

Year

2014/15

Field

Waste Mass Environment

Data streams

Estates management